Installation instructions.
20
Piping and Condensate Drain Line—Indoor
C#lUllON: Be careful to arrange the pipings, drain hose and
cables as shown on page 17 by inserting them into the indoor
unit and reattaching the tubing retaine[
Isulation material
Wrap insulation material around the connecting portion.
•1
Reroute thepipingsandthe connectingcable
acrosstheback of the ehassk.
/
Piping
r
Tubing holding
s
retainer
~ \ ~Hook
=L
@ Push
•l
Indoor unitinstallation.
Hook the indoor unit onto the upper
portion of the installation plate. (Engage the
two hooks of the rear top of the indoor unit
with the upper edge of the installation
plate.) Ensure that the hooks are properly
seated on the installation plate by moving it
left and right.
netting
e
Drain hose
Press the lower left and right sides of the unit against
the installation plate until the hooks engage with their
slots (clicking sound).

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE AS0CD09 and is the answer not in the manual?

GE AS0CD09 Specifications

General IconGeneral
BrandGE
ModelAS0CD09
CategoryAir Conditioner
LanguageEnglish

Related product manuals