EasyManuals Logo

GE JCP910 Installation Instructions

GE JCP910
16 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #8 background imageLoading...
Page #8 background image
8
Installation Instructions
OPERATION CHECKLIST
Remove all items from the cooktop surface.
Turn on the power to the cooktop. (Refer to your
Owners Manual.) Verify that all surface units
operate properly.
Check that the circuit breaker is not tripped or the
house fuse is blown.
Check that conduit is securely connected to the
junction box.
See Owners Manual for troubleshooting list.
NOTE TO ELECTRICIAN:
The power leads supplied with this appliance
are CSA-recognized for connections to larger gauge
household wiring. The insulation of these leads
is rated at temperatures much higher than the
temperature rating of household wiring.
The current-carrying capacity of a conductor
is governed by the wire gauge and also the
temperature rating of the insulation around
the wire.
NOTE: ALUMINUM WIRING
A. WARNING:
IMPROPER CONNECTION OF ALUMINUM
HOUSE WIRING TO THE COPPER LEADS
CAN RESULT IN A SERIOUS PROBLEM.
B. Splice copper wires to aluminum wiring using
special connectors designed and CSA-approved
for joining copper to aluminum and follow the
manufacturers recommended connector
procedure closely.
NOTE: Wire used, location and enclosure of splices,
etc., must conform to good wiring practice and
local codes.
F

Other manuals for GE JCP910

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE JCP910 and is the answer not in the manual?

GE JCP910 Specifications

General IconGeneral
BrandGE
ModelJCP910
CategoryCooktop
LanguageEnglish

Related product manuals