EasyManua.ls Logo

GE JSP47

GE JSP47
16 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5
Installation Instructions
Pre-Installation Cutout and Required
Clearances
A
If cabinets are placed less than 30 above the
range, see Alternate Construction, section AF,
on page 14.
NOTE: Product meets UL requirements for 0
clearance to back and side walls.
Wall coverings, counters and cabinets around
range must withstand heat (up to 194°F)
generated by the range.

Related product manuals