Do you have a question about the GE OSKF and is the answer not in the manual?
Explains primary circuit's position above insulator for enhanced performance and thermal management.
Describes secondary magnetic circuits, materials, winding, and potential for ratio changing.
Details insulation system using oil-impregnated paper and protective metallic bellows.
Outlines transportation requirements, packaging standards, and crate stacking limits.
Details inspection upon delivery, emphasizing damage checks and noting discrepancies.
Lists necessary equipment and procedure for unpacking and positioning the transformer.
Details how to remove bellows blocking device, ensuring bellows remain in good condition.
Explains connecting high voltage cables or tubes to primary terminals for optimal contact.
Notes primary bar is pre-assembled; refers to preparation instructions.
Describes changing current ratio using reconnection bars in the top tank.
Explains connecting transformer's fixation base to substation ground system.
Instructs on connecting protection and measurement instruments to secondary terminals.
Terminal marking follows standards; connection schemes are on plates.
| Brand | GE |
|---|---|
| Model | OSKF |
| Category | Transformer |
| Language | English |