EasyManua.ls Logo

GEA Bock HGX34e/380-4 - Trigger Unit Functionality Testing; MP10 and INT69 G Test Procedures

Default Icon
34 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
D
GB
F
E
I
Ru
19
96178-06.2015-DGbFEIRu
5| Electrical connection
ThecompressorandthetriggerunitMP10areoperationalwhentheH3LED(green)lights.
5.6 Function test of the trigger unit MP10
Pos
Procedure
LED H1 LED H2 LED H3
red red green
1
Interrupt power supply (L1 or SF1) OFF OFF OFF
Releasethemotortemperaturesensorconnection(1or2)
Releasethehotgastemperaturesensor(ifinstalled)(3or4)
2
Restore the power supply (L1 or SF1) ON
Functioncheckofmotortemperaturesensor:operational ON
Functioncheckofhotgastemperaturesensor:operational ON
3
Interrupt power supply again (L1 or SF1) OFF OFF OFF
Reconnectterminals1or2and/or3or4
4
Restore the power supply (L1 or SF1): OFF OFF ON
MP10isoperationalagain
Beforestart-up,troubleshootingormakingchangestothecontrolpowercircuit,checkthefunctionality
ofthetriggerunit:

Related product manuals