EasyManuals Logo

Gecko Futura User Manual

Gecko Futura
21 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #11 background imageLoading...
Page #11 background image
Adjust water balance (pH, TA, calcium hardness) to recommended levels and add sanitizer.
See section Hot Tub Water Maintenance
The hot tub will require 8-10 hours to reach the desired temperature for 240 volt installa-
tions.
Keep insulated safety hard cover on the hot tub, and the air controls closed during the en-
tire heat up process.
in.k300 2 Pump Solid State Control System
"
3
4
in.k300 TechBook
in.k300 keypad layout
6.30"
(160.02 mm)
in.k300 dimensions
Installation of in.k300
To install the in.k300, use the drilling template provided
in this section.
Determine the mounting location and stick the template
on chosen location.
Cut out an opening according to the template.
Clean the installation surface and peel the adhesive
gasket from the back of the keypad.
Insert keypad and align it correctly, then ensure it
is properly glued by gently pressing evenly on the
entire surface.
Gasket with or without adhesive
Optional wing nuts
and spacers
2.25"
(57.15 mm)
1.87"
(47.45 mm)
Up
Down
Light
Pump 1
Indicator lights
Up / Down
Indicator lights
Light
Pump 2
Pump 1
1 Pump Model 2 Pump Model
Set Point
Smart Winter
Mode
Heater
Filter

Other manuals for Gecko Futura

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Gecko Futura and is the answer not in the manual?

Gecko Futura Specifications

General IconGeneral
BrandGecko
ModelFutura
CategoryHot Tub
LanguageEnglish

Related product manuals