9.1 Attention 
●Do adjustment after electrical safety inspection. 
●After the power is switched on, start the test running of heat pump, to see if it can function well. 
●Forced operation is forbidden, because it is very dangerous to work without protector. 
9.2 Preparation Before Adjustment 
●Check that the system is installed correctly. 
●Pipes and cables are connected correctly. 
●Check that accessories are installed. 
●Make sure the drainage is working properly. 
●Make sure the system piping and connections are properly insulated. 
●Check that ground/earth connection had been made correctly. 
●Check that supply voltage can meet the requirement of rated voltage. 
●Check that air inlet and outlet are working correctly. 
●Check that the electrical leakage protector works correctly. 
9.3 Adjustment Process 
●Check that switch of display controller works properly. 
●Check that function keys on display controller work properly. 
● Check that indicator lights work properly.   
●Check that drainage works properly. 
●Check that system works correctly after starting up. 
●Check that water outlet temperature is acceptable. 
●Check if there are vibrations or abnormal sounds when the system is functioning. 
●Check  if  the  wind,  noise  and  condensate  water  produced  by  the  system  affect  the  surrounding 
environment. 
●Check if there is any refrigerant leakage. 
●If any fault occurs, please check the instructions first to analyze and remove the fault. 
 
 
 
 
9. Adjusting and Initial operation