EasyManua.ls Logo

Getinge 46-4 - Maintenance

Getinge 46-4
56 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6 MAINTENANCE
The inside surfaces of the chamber and the load may be hot
directly after disinfection.
• Allow the chamber to cool before starting maintenance.
• Be careful when handling hot loads.
• Wear protective clothing, such as gloves.
6 MAINTENANCE
User Manual Getinge 46-series 27 (56)
<Doc_USR><Doc_6002267102><Rev.B><Lang_en>

Table of Contents