EasyManua.ls Logo

Glow-worm 30ci - Products of Combustion Check; Service Check and Preparation

Glow-worm 30ci
56 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Supplied By www.heating spares.co Tel. 0161 620 6677
33
4000123434-2
9797
97999800
17 Routine Cleaning and Inspection
Diagram 17.3
9533
Diagram 17.4
30ci shown
• Drain the boiler, refer to diagram 17.2.
• On completion check all gas-carrying parts for soundness with
leak detection fluid.
17.3 Front panel
• Unscrew and remove the two retaining screws from the bottom
of the front panel.
• Remove front panel by lifting up and forward.
17.4 Control panel
• Lower forwards to gain access to lower part of boiler.
17.5 Sealed chamber cover
• Unscrew and remove the two retaining screws from the sealed
chamber cover, see diagram. 17.3.
• Lift cover up and off pins on top of boiler.
17.6 Side panels (for ease of access if
available), refer to diagram 17.4
• Unscrew and remove the two retaining screws from front of
each side panel.
• Left hand side panel only disconnect the control panel
retaining strap at the control panel.
• Unhook each panel from the front retaining tabs.
• Pull each panel forward from the rear retaining tabs to
remove.

Other manuals for Glow-worm 30ci

Related product manuals