Key instructions superseding original literature and notes on door seal replacement.
Lists specific kit part numbers and included components for various Glow-worm boiler models.
Details legal obligations, use of approved parts, electrical checks, and reassembly order.
Checks required after replacing a part, including flue system, seals, connections, and pressure.
Guidance on re-assembly, gas soundness testing, purging, and final case fitting.
Specifies requirements for personnel, equipment, and certification for combustion analysis.
Emphasizes the need to measure CO/CO2 ratio for safe combustion verification.
Specific steps for lighting and adjusting LPG models, including lockout troubleshooting.
Procedure for checking and adjusting the maximum gas rate with CO2 analysis.
Procedure for checking and adjusting the minimum gas rate using the offset adjustment.
Instructions to re-check CO2 values and combustion ratio after adjustments.
Guidance on checking operational gas inlet pressure and measuring gas rate at maximum output.
Steps for final completion, including advice for unachievable results and seeking technical help.