Installation and main-
tenance instructions
ENERGY
25c
30c
35c
GB, IE

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Glow-worm ENERGY 30c and is the answer not in the manual?

Glow-worm ENERGY 30c Specifications

General IconGeneral
ModelENERGY 30c
CategoryBoiler
TypeCombi
Output30 kW
Dimensions (H x W x D)740 x 418 x 300 mm
MountingWall-mounted
ERP RatingA
DHW Output (kW)30 kW
Central Heating Flow Temperature Range30-80°C
Max Gas Rate3.2 m³/h
NOx EmissionsClass 5

Summary

Glow-worm Installation and Maintenance Instructions

1 Safety

1.1 Action-related warnings

Classification of warnings and their severity for user safety.

1.2 Risk caused by inadequate qualifications

Details risks associated with unqualified personnel performing installation and maintenance tasks.

1.4 General safety information

Covers risks from gas, flue gas, electric shock, materials, frost, and component safety.

4 Set-up

4.1 Transporting the unit

Instructions for safe handling and transport of the boiler unit, including general guidelines.

4.5 Minimum clearances

Specifies the required clearances around the unit for safe operation and installation.

4.7 Wall-mounting the product

Instructions for securely mounting the unit to the wall.

5 Installation

5.2 Gas and water connections

Detailed instructions for making correct gas and water connections.

5.3 Connecting the drain pipework for the expansion relief valve

Guidance on connecting the pipework for the expansion relief valve.

5.4 Connecting the condensate discharge pipe

Instructions for safely connecting the condensate discharge pipe, including various drainage system types.

5.5 Electrical installation

Instructions for safely performing the electrical installation of the unit.

6 Operation

6.1 Using diagnostics codes

Guide on accessing and setting diagnostic codes for system adaptation.

7 Start-up

7.1 Carrying out the initial start-up

Details the process for initial start-up using the commissioning checklist.

7.2 Checking the type of gas

Ensures the product is set for the correct gas type for optimal combustion.

7.4 Checking and treating the heating water;filling and supplementary water

Procedures for checking and treating heating water quality.

7.5 Avoiding danger arising from insufficient water pressure

Addresses risks associated with low water pressure and system operation.

7.7 Filling and purging the heating installation

Steps to fill and remove air from the heating system.

7.10 Checking and adjusting the gas settings

Guide for checking and adjusting gas settings by qualified personnel.

7.10.2 Checking the gas connection pressure (gas flow pressure)

Procedure to check the gas inlet working pressure.

7.11 Checking leak-tightness

Confirms the leak-tightness of the gas, heating, and hot water circuits.

8 Adapting the unit to the heating installation

9 Handing the product over to the end user

10 Inspection and maintenance

10.2 Observing inspection and maintenance intervals

Adhering to the recommended schedule for inspections and maintenance.

11 Troubleshooting

11.1 Rectifying faults

Steps to correct identified faults and error codes.

11.6 Replacing defective components

Guides for replacing various faulty components of the boiler.

12 Decommissioning the product

Appendix

D Overview of fault codes

Lists and explains fault codes, their meanings, and possible causes.

G Inspection and maintenance work - Overview

Summary table of required inspection and maintenance tasks and intervals.

Commissioning Checklist

Reference to the checklist for boiler installation and commissioning.

GAS BOILER SYSTEM COMMISSIONING CHECKLIST

The official checklist for demonstrating compliance with building regulations.

Commissioning Performance Checks

PRIOR TO CO AND COMBUSTION RATIO CHECK

Essential checks before performing CO and combustion ratio analysis.

VERIFY FLUE INTEGRITY

Procedure to check flue integrity using an analyser.

CHECK CO AND COMBUSTION RATIO AT MAX. RATE

Measuring CO and combustion ratio at maximum boiler output.

CHECK CO AND COMBUSTION RATIO AT MINIMUM RATE

Measuring CO and combustion ratio at minimum boiler output.

K Technical data