EasyManua.ls Logo

Glow-worm ENERGY 15r User Manual

Glow-worm ENERGY 15r
48 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Installation and main-
tenance instructions
ENERGY
12r
15r
18r
25r
30r
GB, IE

Table of Contents

Questions and Answers:

Glow-worm ENERGY 15r Specifications

General IconGeneral
ModelENERGY 15r
CategoryBoiler
TypeRegular
Output15 kW
MountingWall-mounted
Fuel TypeNatural Gas
Central Heating Max Power15 kW
Operating Pressure3 bar

Summary

Safety

1.1 Action-related Warnings

Classification of warnings based on severity.

1.2 Risk from Inadequate Qualifications

Risks associated with unqualified personnel.

1.3 Intended Use

Specifies the product's intended application.

1.4 General Safety Information

Broad safety advice and precautions including risks from gas and weight.

Setup

4.1 Unit Transportation

Instructions for safely moving the unit.

4.5 Minimum Clearances

Required spacing around the product for installation.

4.7 Wall Mounting

Procedures for securely attaching the product to a wall.

Installation

5.1 Preparation for Installation

Essential safety and preparatory steps before installation.

5.5 Gas Connection

Steps for making the gas connection.

5.7 Electrical Installation

Safety and procedure for electrical connections.

5.7.4 Wiring Procedure

Detailed instructions for electrical wiring.

5.7.5 Power Supply Connection

Procedures for connecting the main power supply.

5.7.6 Controller Connection

How to connect external controllers.

Operation

6.1 Using Diagnostics Codes

How to use and set diagnostic codes for configuration.

Start-up

7.1 Initial Start-up Procedure

Procedure for initial product start-up by qualified personnel.

7.4 Heating Water Quality Check

Procedures for checking and treating heating water quality.

7.8 Gas Settings Check and Adjustment

Verifying and adjusting gas settings for optimal performance.

7.8.2 Gas Connection Pressure Check

Verifying gas connection pressure.

7.8.3 Flue Gas Leak-tightness Check

Checking flue gas system for leaks and recirculation.

7.8.4 CO2 Content Check

Measuring and adjusting the CO2 content.

7.9 Leak-tightness Check

Verifying leak-tightness of gas, heating, and hot water circuits.

Adapting to Heating Installation

Inspection and Maintenance

10.4 CO2 Content Check

Procedure for checking CO2 content.

10.5 CO2 Content Setting

How to adjust the CO2 content.

10.14 Leak-tightness Check

Verifying the product is leak-tight.

Troubleshooting

11.1 Rectifying Faults

Guidance on identifying and fixing faults using codes.

11.5 Replacing Defective Components

Procedures for replacing various components.

11.6 Leak-tightness Check

Verifying the product's leak-tightness.

Decommissioning the Product

Inspection and Maintenance Work Overview

Fault Codes Overview

Wiring Diagram

Wiring Diagram, 30 kW

Air/Flue Pipe Opening Position

Horizontal Terminal Positioning

Commissioning Checklist

Technical Data

Related product manuals