Home
Glow-worm
Boiler
ENERGY
Glow-worm ENERGY User Manual
5
of 1
of 1 rating
40 pages
Give review
Manual
Specs
To Next Page
To Next Page
Loading...
Installa
tion
manua
l
Air/flue
systems
ENERGY
,
ULTIMATE,
EASICOM
,
ESSENTIAL,
BETACO
M,
MICRACOM
GB,
IE
2
Table of Contents
Default Chapter
2
Table of Contents
2
Action-Related Warnings
3
Intended Use
3
General Safety Information
3
CE Certification
5
Regulations (Directives, Laws, Standards)
5
2 Notes on the Documentation
6
Observing Other Applicable Documents
6
Storing Documents
6
Validity of the Instructions
6
3 Certified Air/Flue Systems and Components
7
System Overview, 60/100 MM Diameter
7
System Overview, 80/125 MM Diameter
8
4 System Conditions 4
9
Disposing of Condensate
9
Installing the 60/100 MM Diameter Horizontal
10
Wall/Roof Duct
10
Determining the Clearance to the External Wall
10
Scope of Delivery
10
Shortening the Air/Flue Gas Pipe
11
Installing the Wall Duct
11
Installing 60/100 MM Diameter Horizontal Telescopic Wall/Roof Duct
12
Installing the Roof Duct
12
Connecting the Product
13
Installing the Direct, Rear, Telescopic Wall Duct
13
Determining the Pipe Length and the Location of Wall Duct
13
Securing the Telescopic Pipe
13
Installing Direct, Rear-Side Wall Duct for Buildings over 18 M
14
Determining the Pipe Length and the Location of the Wall Duct
14
Black Terminal Set
15
Installing the Black Terminal
15
Installing the Deflector Set
16
Adjusting the Deflector
17
Variable Terminal Set
18
Maximum Permissible Pipe Lengths
18
Opening in the Air/Flue Pipe
19
Installing the Black Variable Terminal Kit
20
Installing the White Variable Terminal Kit
20
Installing Extensions
20
Installing the End Pipe
21
Routing Extensions for the Variable Terminal Set Around Eaves
22
Installing the Vertical Roof Duct, 60/100 MM Diameter
22
Installation Instructions
22
Determining the Pipe Lengths for Vertical, Concentric Air/Flue Pipe
22
Assembling the Vertical Roof Duct
23
Installing the Pitched-Roof Duct
24
Installing the Flat-Roof Duct
24
Air/Flue Systems, 80/125 MM Diameter
25
Installing the 80/125 MM Connection Piece
25
Installing the Horizontal Roof Duct
25
Installing the 80/125 MM Vertical Roof Duct
26
Determining the Pipe Lengths
26
Connecting the Roof Duct
27
Installing the Sliding Sleeve, Elbows and Extensions
28
Installing Elbows
29
Correctly Aligning the Elbows
29
Connecting Extensions with 87° Elbows
29
Connecting Extensions with 45° Elbows
30
Installing the 45° Elbow, 60/100 MM Diameter
31
Installing the 87° Elbow, 60/100 MM Diameter
32
Installing the 45° Elbow, 80/125 MM Diameter
33
Installing the 87° Elbow, 80/125 MM Diameter
35
Installing the Air Pipe Clamps
37
Securing the Telescopic Extension
37
Index
39
5 Set-Up
9
Route of the Air/Flue Pipe in Buildings
9
Location of the Terminal
9
5
Based on 1 rating
Ask a question
Give review
Questions and Answers:
Need help?
Do you have a question about the Glow-worm ENERGY and is the answer not in the manual?
Ask a question
Glow-worm ENERGY Specifications
General
Model
ENERGY
Category
Boiler
Efficiency Rating
A
Fuel Type
Natural Gas
Boiler type
Combi
Mounting
Wall-mounted
Warranty
7 years
Weight
32 kg
Related product manuals
Glow-worm ENERGY 25c
52 pages
Glow-worm ENERGY 25r
48 pages
Glow-worm ENERGY 15r
48 pages
Glow-worm ENERGY 18r
48 pages
Glow-worm ENERGY 30r
48 pages
Glow-worm Energy 30s
64 pages
Glow-worm ENERGY 25s -A
16 pages
Glow-worm Energy7 12s-A
64 pages
Glow-worm Energy 2 30c P
48 pages
Glow-worm Energy7 Series
16 pages
Glow-worm ENERGY 18r -A (H-GB)
16 pages
Glow-worm ENERGY 30r -A (H-GB)
16 pages