EasyManua.ls Logo

Glow-worm ENERGY - CE Certification; Regulations (Directives, Laws, Standards)

Glow-worm ENERGY
40 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Safety 1
0020237648_03 Installation manual 5
1.3.9 Product damage caused by adjacent
channel vents
1 m
1 m
3 m
H › 0
Extremely damp extract air escapes from the
channel vents. This may condense in the air
pipe and cause damage to the product.
Observe the requirements for minimum
clearances in accordance with the figure.
1.3.10 Requirements for the air/flue
terminal
As a result of improper installation, water may
penetrate the building and cause material
damage.
Observe the requirements for the air/flue
terminal in the boiler's installation instruc-
tions.
1.4 CE certification
The heat generators are certified as gas-fired
boilers with associated flue systems in ac-
cordance with the Gas Appliances Regulation
(EU) 2016/426. This set-up instructions are a
component of the certification and are cited
in the type testing certificate. In compliance
with the regulatory statutes of these set-up
instructions, the proof of usability of the ele-
ments identified by Glow-worm article num-
bers that are designed for the air/flue pipe
is provided. If you do not use certified ele-
ments for the Glow-worm air/flue pipe when
installing the heat generators, this voids the
CE conformity of the heat generator. We
therefore strongly recommend that you in-
stall Glow-worm air/flue systems.
1.5 Regulations (directives, laws,
standards)
Observe the national regulations, stand-
ards, directives, ordinances and laws.

Table of Contents

Related product manuals