Set-up 5
0020237648_03 Installation manual 25
5.2 Air/flue systems, 80/125 mm diameter
5.2.1 Installing the 80/125 mm connection piece
1. Fit the connection piece onto the boiler's flue gas con-
nection. In doing so, ensure that the connection piece is
aligned correctly.
2. Secure the connection piece using the 4 screws.
5.2.2 Installing the horizontal wall/roof duct
article number 0020257018
5.2.2.1 Scope of delivery
8
7
9
10
6
4
5
3
1
2
1 Outer wall collar
2 Inner wall collar
3 Wall duct
4 Screws (2 x)
5 Air pipe clamp
6 Connection elbow
7 Screws (2 x)
8 Air pipe clamp
9 Screws (2 x)
10 Screws (2 x)
5.2.2.2 Installing the wall duct
136
3
4
1
2
1. Slide the wall duct into the wall until the end of the wall
duct protrudes slightly from the interior wall.
In this position, you can pull back the wall duct as
far as the connection elbow.
After installation, the air inlet (4) must lie completely
outside of the wall and the outer wall collar (3).
2. Slide the inner wall collar (1) back against the wall and,
if required, use a suitable sealant to seal the wall collar.
3. Use the air clamp to secure the connection elbow to the
connection piece (2).
4. Align the elbows correctly. ( Page 29)
5. Connect all of the pipe joints with air pipe clamps.
( Page 37)
6. Check whether the rubber seal on the outer wall collar
(3) is securely sealed against the wall.
7. Install the boiler ( Installation instructions for the
boiler).
5.2.2.3 Installing the horizontal roof duct
1. Order the dormer from: Ubbink, Northants, Telephone
+44 (0) 1280 700211.