EasyManua.ls Logo

GMI Tricon - DIN-Rail Clip Installation; DIN-Rail Clip Attachment Procedure; Securing Clips with Screws

Default Icon
52 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Termination Boards for Tricon & Tricon CX G.M. International ISM0452-6
4
DIN-Rail clip installation on termination board enclosure
For termination board with 1x or 2 x Plastic DIN-Rail clips TBE-FIX-PL-001, extract each clip and related instruction sheet from plastic bag. Follow the instruction sheet and the following
figures to change lever position (from default to specific for TBE-D50xx-TRI-xxx) on each clip:
Default position
Instruction sheet Changing lever position
Specific position for TBE-D50xx-TRI-xxx
For the termination boards TB-D5016-TRI-010 and TBE-D5016-TRI-010, place the enclosure as shown in the following figures and fix each Plastic or Metal DIN-Rail clip to enclosure
by 2 x M3 (10 mm) screws included on TBE-FIX set:
With 2 x Plastic DIN-Rail clips TBE-FIX-PL-001
With 2 x Metal DIN-Rail clips TBE-FIX-MT-001
For the termination boards TBE-D5016-TRI-001, TBE-D5016-TRI-002, TBE-D5016-TRI-003, TBE-D5016-TRI-004, TBE-D5016-TRI-005, TBE-D5016-TRI-006, TBE-D5016-TRI-007,
TBE-D5016-TRI-008, TBE-D5016-TRI-009, TBE-D5016-TRI-011 and TBE-D5016-TRI-012, place the enclosure as shown in the following figures and fix each Plastic or Metal DIN-Rail
clip to enclosure by 2 x M3 (10 mm) screws included on TBE-FIX set:
With 2 x Plastic DIN-Rail clips TBE-FIX-PL-001
With 2 x Metal DIN-Rail clips TBE-FIX-MT-001
On TBE enclosure must be installed 1 or 2 DIN-Rail clips (according to the model) to be chosen between two possible versions: TBE-FIX-PL-001 (Plastic) or TBE-FIX-MT-001 (Metal).
On TBE order, customer can add TBE-MNT-001 code (for each DIN-Rail clip) to request DIN-Rail clip factory mounting. Otherwise, customer follows DIN-Rail clip installation procedure.