EasyManua.ls Logo

GO FAN YOURSELF Z-TECH - Installation Checklists; Installation Check In; Installation Check Out

Default Icon
49 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Go Fan Yourself
1032 National Parkway
Schaumburg, IL 60173
1-844-GOFANME (463-2663)
1-847-648-4920
www.GoFanYourself.com
Company:
Address: City/
State/Zip:
Email:
Contact Name:
Phone:
Installation crew supervisor and facility manager are to complete checklist prior to entering the jobsite or unloading materials.
1. Contractor and customer have reviewed the scope of work/layout including: fan placement, controller placement, and power supply panel(s) to be used.
3. Contractor and customer have reviewed the installation schedule and any site specific safety rules and regulations (i.e., specific requirements, gear, certifications,
Additional Comments:
Customer Signature:
Printed Name:
Date:
Installation crew supervisor and facility manager are to complete checklist after completing installation.
Customer Signature:
Printed Name:
Date:
Contractor Signature:
Printed Name:
Date:
INSTALLATION CHECK IN
INSTALLATION CHECK OUT
Email completed form and required pictures to: drew@gofanyourself.com
2. Contractor and customer have reviewed the fan installation manual for the type of fan mount at each location.
Contractor Signature:
Printed Name:
Date:
lock out/tag out, prohibited areas, secure areas, areas to avoid, special machinery, dangerous conditions or areas and how to detour such places if needed):
1. Fan and controller placement agrees with the check in (above), scope of work and layout.
2. Contractor has reviewed with the customer the breaker location for all fans and the customer understands the lock out/tag out (LOTO) procedure
on all fan controllers.
3. No safety incidents were reported by or on the contractor during the fan installation.
4. All fans are running and the customer has been trained on operation in both directions. The fan operation section of the manual has been reviewed.
5. The customer understands the warranty for each fan and the warranty information in the manual has been reviewed.
6.
The customer has been given a copy of the installation manual for all styles of GFY fans installed as part of this project.
7. The customer is comfortable with fan operation including starting/stopping, speed adjustment, reversing direction, and power disconnect with LOTO.
8. The contractor has taken pictures of all fans individually clearing showing the full fan in the ceiling (required to active the warranty).
9. The contractor has taken pictures of all fans clearly showing the routing and connection of both safety cables (required to active the warranty).
10. The contractor has taken pictures of all fan controllers once mounted in their final locations (required to activate the warranty).