EasyManua.ls Logo

Goldhofer AST-2 R - User Manual

Goldhofer AST-2 R
42 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
Operation and
Maintenance manual
Goldhofer
Goldhofer O T I Sver orque- ndication- ystem
Documentation GOTIS for AST-2 R
V01-10.2012
Property of American Airlines

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Goldhofer AST-2 R and is the answer not in the manual?

Summary

1.0 GOTIS Monitoring; Operator Controls

Indicator Lamps in the CDM

Explains the green, yellow, and red indicator lamps and their meanings.

2.0 Description of GOTIS

Warning Thresholds

Details yellow and red warning lamp behavior and alarm reset.

4.0 Maintenance Schedule

5.0 Maintenance Tasks

Electrical Check of GOTIS

Outlines the annual electrical check procedure for GOTIS components.

Checking Voltage Supply to Measuring Amplifier

Details how to check the operating voltage at the measuring amplifier terminals.

Checking Voltage Supply to Measuring Cell

Explains how to check the operating voltage for the measuring cell.

Checking the Measuring Signal

Describes checking the signal voltage at the measuring cell.

Checking Output Signal at Measuring Amplifier

Details how to check the output signal from the measuring amplifier in mA.

5.4 GOTIS - Test log

6.0 GOTIS Electrical Adjustment Values

7.0 Troubleshooting List

Troubleshooting List

A template for recording error messages, causes, and remedies.

Goldhofer AST-2 R Specifications

General IconGeneral
ManufacturerGoldhofer
ModelAST-2 R
CategoryTractor
Drive4x4
Max. Speed32 km/h
Length7.5 m