EasyManua.ls Logo

Goldwing RC SLICK540 70E - User Manual

Goldwing RC SLICK540 70E
38 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
All contents copyright 2015, GOLDWING RC Version 1.0, Dec 2015
GOLDWING RC
61in SLICK540 70E
Electric Extreme Series
Question and Answer IconNeed help?

Do you have a question about the Goldwing RC SLICK540 70E and is the answer not in the manual?

Summary

Specifications

A QUICK WORD ABOUT SAFETY AND RADIO CONTROL FLYING MODELS

GOLDWING RC WARRANTY AND RETURN POLICY

Details GoldWing RC's guarantee on material and workmanship, covering warranty and return policy for the aircraft.

Features and Photo Gallery

Key Features and Design

Highlights aerodynamic features like streamlined canopy and SFGs, pre-hinged surfaces, and quality accessories.

Items Required to Complete This Model

Shop Supplies;Tools

Aircraft Covering

Instructions on using covering iron and heat gun for adhesion, and sealing hinge gaps for improved flight.

Construction

Rudder Assembly

Detailed steps for assembling the rudder, including control horn installation and servo bay setup.

Landing Gear Installation

Main Gear and Axle Installation

Instructions for bolting the main gear to the fuselage and installing wheel axles with collars and thread-lock.

Wheel Pant and Tail Wheel Assembly

Guides fitting wheel pants and securing them, and assembling the tail wheel for electric airplanes.

Wing Assembly

Aileron Control Horn and Servo Installation

Guides control horn installation on ailerons and servo mounting, routing, and linkage adjustment.

Elevators Assembly

Elevator Control Horn and Servo Installation

Guides elevator control horn fitting, stabilizer gluing, servo mounting, and linkage adjustment.

Motor Mounting

Firewall Preparation and Motor Positioning

Details blind nut pre-installation and using washers/crosses to position the motor correctly behind the firewall.

Cowl Installation

Cowl Fitting and Securing

Instructions for testing cowl fit, aligning pre-drilled holes, and securing with self-threading screws.

Final Radio System Installation

Receiver and Battery Mounting

Guidance on securely mounting receivers and batteries, ensuring proper vibration isolation and cooling.

Servo and Battery Lead Management

Ensures secure routing of servo and battery leads, checking wire quality and connector integrity.

Balancing and Pre-Flight

Center of Gravity (CG) Setting

Recommends initial CG setting and explains how to trim for level flight, checking for pitch sensitivity.

Recommended Control Surface Deflections

Provides recommended low and high rate control surface deflections for elevator, rudder, and ailerons.

Final Assembly and Pre-Flight Inspections

Check batteries, radio systems, and wing installation before the first flight.

Side Force Generator (SFG) Installation

Goldwing RC SLICK540 70E Specifications

General IconGeneral
BrandGoldwing RC
ModelSLICK540 70E
CategoryToy
LanguageEnglish

Related product manuals