EasyManua.ls Logo

Good Health Saunas GS3-E User Manual

Default Icon
3 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Choose a locaon to enjoy the
sauna. Place the base on the oor of
chosen locaon.
Insert back panel onto the base and have
someone hold it in place while you insert
side panel. Insert the le side window
panel. Make sure the tongs and grooves
are well inserted into one another.
Fasten the outside buckle.
Slide in the lower part of bench.
Connect lower part of bench and
make sure all connecons are secure.
Slide top part of bench completely and
securely into place.
GOOD HEALTH SAUNAS
STEP-BY-STEP SAUNA INSTALLATION GUIDE
(GS3-E)
Congrats on your new Good Health Sauna, we know you’re going to love it. Installing your far infrared sauna is easier than
it may seem, and we’re here to show you. Please read and view the step-by-step overview and installaon instrucons for
GHS saunas below. If you have any addional quesons regarding set-up and installaon, please call: 888-997-2862.
© GHS 2019 • www.goodhealthsaunas.com • 888.997.2862
1 2
3
4
Question and Answer IconNeed help?

Do you have a question about the Good Health Saunas GS3-E and is the answer not in the manual?

Good Health Saunas GS3-E Specifications

General IconGeneral
BrandGood Health Saunas
ModelGS3-E
CategoryPlumbing Product
LanguageEnglish

Summary

Good Health Saunas Step-by-Step Installation

Choosing Location and Base Setup

Select a location and place the sauna base on the floor.

Back and Side Panel Assembly

Insert back panel, hold in place, insert left side panel, and fasten.

Bench Installation

Slide in the lower part of the bench and ensure connections are secure.

Top Bench Installation

Slide the top part of the bench securely into place.

Right Side Panel Installation

Insert the right side window panel, ensuring grooves connect.

Exterior Buckle Fastening

Fasten the outside buckles on the sauna structure.

Front Panel Installation

Insert the front window panel, aligning grooves and orientation.

Door Handle Installation

Install the door handle onto the sauna door.

Pre-Roof Installation Checks

Check all cables and push them in before roof installation.

Heater and Roof Panel Connections

Push heater plugs through top panel holes and connect plugs.

Control Panel Installation

Locate and connect flat connector wires to the control panel.

Stereo and Antenna Connections

Connect stereo, antenna wires, and mount to ceiling.

Ionizer and Dust Cover Installation

Connect ionizer to ceiling wire and attach dust cover.

Final Power Connection

Plug the sauna into a wall outlet to complete installation.

Related product manuals