EasyManua.ls Logo

Gravity Zero MK II - Pre-Dive Preparation; Oxygen Cylinder Checks

Default Icon
15 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
MK II - Figure 5, Functional Diagram
5. PRE-DIVE PREPARATION
Before every dive with the rebreather MK II it is necessary to check the following points:
Checks and Refills Oxygen Cylinder.
Open the shut-off valve and verify the pressure value on the gauge; If the pressure value is less than 190 bar
refill the cylinder with pure oxygen as follows:
Warning: open slowly the shut-off valve; the high pressure oxygen flow may
burn or explode
close the shut-off valve
push down the bypass button to assure that the pressure discharge (make sure that high pressure gauge
indicates zero).
MK II Oxygen Rebreather User Manual - Revision 01/2018 - Copyrights : Dr Fabrizio Pirrello © 2001- 2018