EasyManua.ls Logo

Gree GUD125ZD/A-T

Gree GUD125ZD/A-T
195 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GREE U-Match 5 SERIES UNIT SERVICE MANUAL
121
Removal of evaporator
Note: Make sure power is cut off. Take good care of the copper pipe and aluminum fins. If the removal takes a long
time, please put the copper pipe under pressure.
Step
Picture
Work instruction
3. Remove the
evaporator.
Take off the evaporator.
The removed evaporator
is as shown in the
picture.
4.5.2.3 Floor Ceiling Unit
Take model GUD160ZD/A-T as an example.
Removal of front grill
Note: Before removal, make sure power is cut off. During the removal procedure, take good care of all the
components. Do not place the filter near any heat source.
Step
Picture
Work instruction
Remove the
sub-assembly of front
grill.
Twist off the 2 hooks
of the grill and the
screws of the hooks.
Open the grill and
remove 2 lower
clamps. Then remove
th
e grill.
Remove the right and left decorative boards
Note: Before removal, make sure power is cut off. During the removal procedure, take good care of all the
components. Do not scratch the appearance components.
Step
Picture
Work instruction
Remove the left and
right panels.
Use a screwdriver to
loosen the screws, as
shown in the picture.
Then pull the right
and left panels
upward. (Lines in the
picture indicate the
positions of screws.)

Table of Contents

Other manuals for Gree GUD125ZD/A-T

Related product manuals