EasyManua.ls Logo

Gree GWH07AAAXA-K3NNA2A - Page 80

Gree GWH07AAAXA-K3NNA2A
112 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
77
Installation and Maintenance
Service Manual
Step Procedure
3.Remove panel
Open the front panel; separate the panel rotation shaft
from the groove xing the front panel and then removes
the front panel.
Note:
The display of some models is fixed on the panel;
unscrew the screws fixing the display on the panel
before removing the panel.
4.Remove electric box cover 2
Remove the screws on the electric box cover 2 to
remove the electric box cover 2.
5.Remove front case sub-assy
a
b
Remove the screws xing front case.
Note:
(1) Open the screw caps before removing the screws
around the air outlet.
(2) The quantity of screws fixing the front case sub-
assy is different for different models.
Loosen the clasps at left, middle and right sides of front
case. Life the front case sub-assy upwards to remove
it.
Front case subassy
Electric box cover 2
Screw
Screw
Screw
Panel rotation
Groove
Panel
Front panel
Screw caps
Right clasp
Middle clasp
Left clasp
Front case sub-assy
Front case
sub-assy
Display

Related product manuals