EasyManua.ls Logo

Gree GWH12QB-K6DNB4A - Page 160

Gree GWH12QB-K6DNB4A
182 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
158
Installation and Maintenance
Service Manual
Step Procedure
7. Remove electric box assy
Remove the terminals, lift up and rotate the electrical
box assy to the right so that the snaps on the clapboard
are removed and the electrical box assy are removed.
8. Remove motor
Remove the screws xing the motor and then remove
the motor.
9. Remove motor support
Remove the screws xing the motor support and lift the
motor support to remove it.
motor support
motor

Related product manuals