EasyManua.ls Logo

Gree MULTI24HP230V1EO - Page 75

Gree MULTI24HP230V1EO
89 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
72
Installation and Maintenance
Service Manual
Step Procedure
13. Remove 4-way valve assy
Remove screws xing the electricbox; loosen the wire
bundle; pull out the wiring terminals and then pull
electric box upwards to remove it.
14. Remove valve support sub-assy and expansion
valve assy
Remove the screw connecting the valve support and
the chassis, and then remove the valve support assy.
Unsolder the welding joint connecting the electronic
expansion valve assy with the cut-off valve and the
condenser connection pipe, and then remove the e
xpansion valve assy.
15. Remove Inhalation Tube Sub-assy
Remove all spot welds connected with Inhalation Tube,
and then remove the cInhalation Tube Sub-assy.
4-way valve assy
Expansion valve assy
Valve support assy
Inhalation Tube
Sub-assy

Other manuals for Gree MULTI24HP230V1EO

Related product manuals