EasyManua.ls Logo

Gree WK-010PW

Gree WK-010PW
23 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operating Manual for Central Air Conditioner Thermostat
6
4.1 Installation position
As shown in the picture below, the thermostat should be tted on the
position 1.5 meters above the oor.
1.5m
4.2 Installation preparations
(1) Cut o󰀨 the main power supply.
(2) Label each conductor and wire them according to the wiring diagram.

Related product manuals