EasyManua.ls Logo

Grotime Rollover - Tighten All Bolts; Operate Drop Side

Grotime Rollover
12 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
STEP 9
TIGHTEN ALL BOLTS
STEP 10
OPERATION
Base shown in Lower Position.
1.
2.
3.
To lower drop side, lift from centre of top rail, hold side in that position while using your leg to push inward on
centre of bottom rail. Then allow to slide gently down.
7

Related product manuals