EasyManua.ls Logo

GROUND FORCE 717H01 - Page 40

Default Icon
57 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
WWW.GFWORLDWIDE.COM | +1 (208) 664-9291
MAINTENANCE LOG
DATE ▼
MONTHLY MAINTENANCE SCHEDULE
CHANGE HYDRAULIC FILTER(S)*
MONTHLY
INSPECT FOR DAMAGE, LOOSE SET SCREWS, & LEAKS:
• HOSES
FITTINGS
PUMPS AND MOTORS, INCLUDING COUPLERS
ADJUST AS NEEDED:
WATER PUMP STUFFING BOX (DROPLET RATE OF 40-60 DPM)
OPERATE THE AUXILIARY HEATER FOR 10 MINUTES
2-MONTH MAINTENANCE SCHEDULE
2 MONTHS
LUBRICATE:
WATER PUMP
• HOSE REEL FAIRLEAD ROLLERS
HOSE REELS AND SWING JOINTS
4-MONTH MAINTENANCE SCHEDULE
4
MO.
INSPECT HYDRAULIC OIL
6-MONTH MAINTENANCE SCHEDULE
6
MO.
INSPECT OIL COOLER
INSPECT ANODES; REPLACE IF NECESSARY
YEARLY MAINTENANCE SCHEDULE
YEARLY
INSPECT FOR DAMAGE, LOOSE CLAMPS OR CRACKS:
PPE TIE OFF CABLE ON TOP OF TANK
PPE TIE OFF POINTS ON REAR AND BOTTOM OF TANK
CLEAN WATER PUMP SUCTION STRAINER*
SERVICE AUXILIARY HEAT SYSTEM*
YEARLY MAINTENANCE SCHEDULE
2
YR
REPLACE OIL COOLER*
*NOTE: FREQUENCY MAY VARY DEPENDING ON NEED. IT IS THE USER'S RESPONSIBILITY TO ESTABLISH APPROPRIATE SERVICE INTERVALS.
40
MAINTENANCE SCHEDULES