EasyManua.ls Logo

Growatt 2500MTL - Page 24

Growatt 2500MTL
38 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6.2.2.1.Autotest
Connect the Inverter and the PC by RS232;
Power on the inverter, check the inverter com address, and wait the inverter to
connect to grid;
Open the PC software ShineBus, and select page “5 Auto Test”; set the PC com
port(COM) and the inverter com address(Inv Add);
Click button “Test” to test the SPI function;
Wait the test finish, there are 8 levels testing;
The test result data is saved in the “Auto test report of xxxxxx .txt” under the
Software install direction;
40 41