EasyManua.ls Logo

Grundfos CUE - Page 7

Grundfos CUE
26 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Mounting
The user is responsible for mounting
CUE securely on a firm surface.
1. Mark and drill holes.
2. Fit the screws at the bottom, but leave loose. Mount CUE, and
tighten the four screws.
b
aa
b
TM038860
Drilling holes in the wall
Mounting on the floor
WARNING
Crushing of feet
Death or serious personal injury
‐
CUE is very heavy and may
fall over if the pedestal is not
anchored to the floor.
The user is responsible for mounting
CUE securely on a firm surface.
See the pedestal-kit instructions for
further information.
By means of a pedestal (optional), CUE can also be mounted on
the floor.
1. Mark the mounting holes on the floor. See the figure below.
2. Drill the holes.
3. Mount the pedestal on the floor.
4. Mount CUE on the pedestal using the enclosed screws.
1
2
3
4
5
6
TM059669
Drilling template for pedestal
Pos.
D1h
[mm]
D2h
[mm]
D5h/D7h
[mm]
1 400 400 200
2 325 420 326
3 284 379 290
4 240 240 235
5 4 x 14 4 x 14 4 x 14
6 217 317 290
7
English (GB)

Other manuals for Grundfos CUE

Related product manuals