EasyManua.ls Logo

Haier HFC3501ACW - Freezer Installation; Step 1 - Unpack Freezer

Haier HFC3501ACW
56 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
8
FREEZER INSTALLATION
STEP 1 - UNPACK FREEZER
WARNING
Fire or Explosion Hazard
Do not puncture refrigerant tubing.
Follow handling instructions carefully.
Flammable refrigerant used.
Failure to do so can result in death, explosion or fire.
IMPORTANT: Handle with care when moving freezer to avoid either damaging the
refrigerant tubing or increasing the risk of a leak.
IMPORTANT: When moving the freezer, never tilt it more than a 45° angle. This could
damage the compressor and the sealed system. If the freezer has been placed in
a horizontal position for any period of time, wait 24 hours before plugging in the
freezer to allow the refrigerant to settle.
1. Remove and dispose of/recycle all packing materials. This includes the foam
base and all adhesive tape. Remove all protective packaging covering the
freezer.
2. Remove user manual and other printed material before turning on the freezer.
3. Clean the exterior surface with a soft cloth.

Table of Contents

Related product manuals