Please read these instructions carefully before installing, servicing, or operating the equipment.
This manual may be modified without notice. See: www.harken.com/manuals for updated versions.
PLEASE SAVE THESE INSTRUCTIONS
MKIV JIB REEFING & FURLING
Unit 1
Installation Manual – Intended for specialized personnel or expert users
4417 12/18
Preassembly
Safety Precautions/Parts Descriptions 2
Sizing Check 3
Parts 4
Rigging Parts Check/Tools 5
Dimensions/Sailmaker's Instructions 6
Toggle Deductions/Stay Into Foil Options 7
Top Foil Length 8
Short Top Foil 9
Confirm Foil Length 10
Assembly
Foils/Connectors 11–17
Halyard Swivel 17
Drum Assembly 18
Rod Rigging 19
Turnbuckle/Toggle 20–21
Final/Feeder 22–23
Commissioning
Turnbuckle 24
Line to Cockpit 25
Halyard Wrap/Prevent Halyard Wrap 26
Pendant/Halyard Restrainer/ Halyard Tension 27
Operation
Spinnaker Halyards/Headstay Tension 28
Raise Sails 29
Furl/Reef 29–30
Secure Sail 30
Race Conversion 31
Maintenance
Clean/Inspect 32
Replace Line 32
Storage/Remove Furler 32
Troubleshoot 33
Online Warranty/Product Registration 33
Appendix 34–35