-08-
Installation Guide
Two people are required to set up the foundaon.
NOTE: To avoid damage to the foundaon, always open the
carton while the bed is in the at posion.
Open the shipping box and take out top decking.Cut the
ribbon securing accessory Boxes&maress retainer bar
and put them aside. Carefully take out the bed frame from
packaging and open it .
1.
2. To install all six legs (see image A on the boom right), thread
the bolt of the leg to the nut on the foundaon frame, and
ghten by hand. DO NOT OVERTIGHTEN.
3. Uncoil the input power cord (connected to the control box’s
power port) and plug it into the power supply.
4. Uncoil the power cord and connect it to the power supply.
Nut on the frame is removable
and replaceable.
Please remove tape on the nut
to install legs.
WARNING