EasyManua.ls Logo

Hastings IHR SERIES User Manual

Hastings IHR SERIES
31 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Installation and Service Manual
“IHR/ISHR/HR/R” SERIES
INDOOR/OUTDOOR SYSTEMS
Supplement to “RD” Series Rooftop
Gas Duct Furnace Manual, ISHRDV-1
Notice
Read These Instructions Before Installation
Inspect unit on arrival for any shipping damage. This unit
has been test fired for at least 15 minutes to prove out all
phases of operation. If any part is missing or damaged,
notify the carrier at once.
TABLE OF CONTENTS
Page
(IH) (ISH) (H) RHF (IH) (ISH) (H) RMU and ((IH (ISH) (H) RHV Unit Dimensions.....................
1-2
(H) RHF and (H) RHV Unit Dimensions with Optional Intake and Discharge
Plenums and Curbs……………………………………………………………...........................
2-3
(H) RMU and (H) RHV Unit Dimensions with Optional Discharge
Plenums and Curbs………………………………………………………………........................
4-5
Shipping………………………………………………………………………………………………….
5
Hoisting Unit…………………………………………………………………………………………….
5
Installation……………………………………………………………………………………………….
6
Electrical…………………………………………………………………………………………………
6
Location…………..……………………………………………………………………………………...
7-8
Gas Supply Piping……...………………………………………………………………………………
9
Operation of Mechanical Modulating Valve………………………………………………………….
10
Operation of Electronic Modulating Valve……………………………………………………………
11
Maintenance……………………………………………………………………………………………
12-13
ISIRHS-1
April 2008
Question and Answer IconNeed help?

Do you have a question about the Hastings IHR SERIES and is the answer not in the manual?

Hastings IHR SERIES Specifications

General IconGeneral
BrandHastings
ModelIHR SERIES
CategoryFurnace
LanguageEnglish

Summary

LOCATION

CLEARANCES/INSTALLATION

Specifies minimum clearances from combustible material for indoor and outdoor models.

Venting

Gas Supply Piping

OPERATION

Maintenance

INSTALLATION

Location

Details requirements for unit placement and clearances for installation.

Venting

Covers requirements for positive pressure flue vent and Type "B" gas vent.

TROUBLE SHOOTING

CLEANING