g60
Installation manual
TOF/TOR
K 085149
0706
Question and Answer IconNeed help?

Do you have a question about the Henderson g60 and is the answer not in the manual?

Henderson g60 Specifications

General IconGeneral
BrandHenderson
Modelg60
CategoryGarage Door Opener
LanguageEnglish

Summary

1 TOF, TOR: Initial Measurements and Tools

1.1 Dimensions and Layout

Identifies key dimensions (A, B, C, D, E, F) for installation positioning.

1.2 Required Tools and Materials

Lists necessary tools like drill, pliers, level, and fasteners.

2 TOF, TOR: Component Assembly

2.1 Track Part Identification

Shows components labeled 1 and 9 for track assembly.

2.2 Fastener Usage

Illustrates the use of fasteners (part 2) with quantity x3.

3 TOF, TOR: Rail Mounting

3.1 Vertical Track Installation

Details the mounting of the vertical track (part 1) to the wall.

3.2 Horizontal Rail Attachment

Shows attachment of horizontal rail components (parts 4, 5, 6).

4 TOF, TOR: Vertical Track Securing

4.1 Wall Mounting of Vertical Track

Securing the vertical track (part 1) to the wall using fasteners.

5 TOF, TOR: Horizontal Track Installation

5.1 Attaching Horizontal Tracks

Mounting the horizontal tracks (part 1) to the vertical tracks.

6 TOF, TOR: Torsion Spring System

6.1 Installing Spring Components

Illustrates the installation of the torsion spring system.

7 TOF, TOR: Horizontal Track Support

7.1 Mounting Track Support Brackets

Attaching support brackets (part 3) for the horizontal track.

8 TOF, TOR: Vertical Track Adjustment

8.1 Adjusting Vertical Track Alignment

Fine-tuning the position of the vertical tracks (parts 4, 5, 6, 7).

9 TOF, TOR: Door Panel Attachment

9.1 Securing Panels to Track

Attaching the door panels to the track system using rollers (part 7).

10 TOF, TOR: Operator Arm Connection

10.1 Attaching Operator Arm

Connecting the operator arm (part 1) to the door.

11 TOF, TOR: Spring Assembly

11.1 Installing Spring and Cable Drums

Assembling the torsion spring (part 1) and cable drums (parts 3, 4, 5).

12 TOF: Final Checks

12.1 TOF Model Final Assembly

Completing the installation and performing initial checks.

12 TOR: Final Checks

12.1 TOR Model Final Assembly

Completing the installation and performing initial checks for TOR.

13 TOF, TOR: Roller Installation

13.1 Installing Rollers

Fitting the rollers (parts 1, 2, 3, 4, 5) into the door panels.

14 TOF, TOR: Cable Winding

14.1 Winding the Lift Cables

Detailing the process of winding the lift cables (part 4a, 4b).

15 TOF: Operator Mounting

15.1 Mounting the Operator Unit

Securing the operator unit (part 1) to the structure.

15 TOR: Operator Mounting

15.1 TOR Operator Unit Installation

Mounting the operator unit for the TOR model.

16 TOF, TOR: Door Panel Adjustments

16.1 Adjusting Panel Position

Making adjustments to the door panels (parts 3, 4, 5) for proper alignment.

17 TOF, TOR: Door Balancing

17.1 Balancing Door Height

Ensuring the door is correctly balanced for different sizes (B=1900-2250, etc.).

18 TOF, TOR: Wall Anchors

18.1 Wall Anchor Installation

Installing wall anchors for securing the system (A<=3000 and A>3000).

19 TOF, TOR: Safety Edge

19.1 Installing Safety Edge

Attaching the safety edge sensor (part 2) to the door.

20 TOF, TOR: Operator Connection

20.1 Connecting Operator to Door

Linking the operator arm (part 1) to the door mechanism.

21 TOF, TOR: Initial Movement Test

21.1 Testing Door Movement

Performing an initial test of the door's movement cycle.

22 TOF, TOR: Final Operation Check

22.1 Final Operation Verification

Confirming the complete and correct operation of the garage door.