NN1-1536 Rev.03.1
ATU-PVT-PCM1 Instruction Manual
Added the section “Incident Reporting”.
(“Before Reading this Manual”)
Added the table “Storage environment specifications.
Added the table “Each unit Sound Pressure Level”.
Added the section “Electromagnetic Compatibility”.
(Chapter 1-3)
Updated “Unit Plate” table and symbol table
(Chapter 1-4)
Added description regarding cleaning frequency.
(Chapter 1-5)
Changed the website URL.
Added EC Rep information.
(Back page)
Apr. 6
th
, 2022 Y. Thuresson R3.1 Replaced the term “rack”, “sample tube holder”, and
“STH” with “single-sample holder” or “SSH” in the entire
document.
Updated the table “Words and Definitions”.
(“Before Reading this Manual”)
Added the section “Table of Contents”.
Updated the description of “Intended Purpose”.
(Chapter 1-1)