SUBJECT CHAPTER/SECTION PAGE
2. Preparation for Storage 1-2 4
A. General 1-2 4
B. Temporary Storage 1-2 5
C. Long Time Storage (Over 30 Days) 1-2 5
3. Preparation for Shipment
(Tractor-Mounted Units Only) 1-2 6
SECTION 3. OPERATION 1-3 1
1.General 1-3 1
2. Operating the Generator Set 1-3 1
A. Pre-start Inspection 1-3 1
B. Normal Engine Starting Procedures 1-3 1
C. Cold Weather Engine Starting Procedures 1-3 4
D. Preparation for Power Delivery 1-3 5
E. Power Delivery 1-3 6
F. Preparation for Power Delivery
(Manual Voltage Control) 1-3 6
G. Power Delivery (Manual Voltage Control) 1-3 7
H. Discontinue Power Delivery 1-3 7
K. Stopping the Engine 1-3 7
3. Test Box Operation 1-3 8
4. Transformer-Rectifier Operation 1-3 9
A. Direct Current Power Delivery 1-3 9
B. Simultaneous 28.5-V DC and 115-V AC
Power Delivery 1-3 10
6. Trailer Operation 1-3 11
A. Towing 1-3 11
B. Parking 1-3 11
CHAPTER 2. SERVICE
SECTION 1. MAINTENANCE 2-1 1
1. General 2-1 1
2. Operation of Roll-Out Feature
(For Tractor-Mounted Units Only) 2-1 1
A. Roll Generator-Set Out for Service 2-1 1
B. Roll Generator-Set In to Normal Position 2-1 1
3. Inspection 2-1 1
4. Lubrication 2-1 3
A. General 2-1 3
B. Generator 2-1 3
C. Generator Controls 2-1 3
OM-2031
August 5/89 Revised Table of Contents
Page 3