Figure 4
Figure 5
Step 3: Assemble the arms to the Power Management Board.
Attach the arm to the Power Management Board, see Figures 6 and 7. Use M2 5X6 screws
a total of 2 in each arm. Insert the screws from the bottom of the plate, see Figure 8. Make
sure the ESC cables run through the middle of the arm, see Figure 9.