EasyManua.ls Logo

horsch Pronto 3 - 6 DC User Manual

horsch Pronto 3 - 6 DC
129 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
TRANSLATION OF THE ORIGINAL OPERATING INSTRUCTIONS
READ CAREFULLY PRIOR TO STARTING UP!
KEEP OPERATING INSTRUCTIONS IN A SAFE PLACE!
ART.:
ISSUE:
OPERATING INSTRUCTIONS
0208
05/2019
8044
Pronto 3 - 6 DC

Table of Contents

Questions and Answers:

horsch Pronto 3 - 6 DC Specifications

General IconGeneral
Brandhorsch
ModelPronto 3 - 6 DC
CategoryFarm Equipment
LanguageEnglish

Summary

Introduction

Foreword

Read and comply with instructions to avoid accidents and downtime.

Notes on representation

Explains warning notes (DANGER, WARNING, CAUTION) and instruction notes.

Safety and responsibility

Intended use

Defines the machine's intended use and lists unintended uses.

Operating Instructions

Emphasizes the importance of following operating instructions for safety.

Children in danger

Personal protective outfit

Safety in operation

Commissioning

Ensuring safe operation through correct commissioning procedures.

Coupling and uncoupling

Hydraulics

Pressure accumulator

Safety notes and procedures for handling pressure accumulators.

Brake system

What to do in case of voltage flashover

PTO-shaft / propshaft

Use in the field

Fertiliser and dressed seed

Care and maintenance

Danger zone

Technical data

Pronto 3 DC

Technical specifications for the Pronto 3 DC model.

Pronto 6 DC

Technical specifications for the Pronto 6 DC model.

Requirements for the tractor

Engine power

Minimum and maximum engine power requirements for different Pronto models.

Calculating the ballasting

Operation

Commissioning / Tractor change

Adapting the machine to the tractor during initial commissioning.

Connecting

Transport position

Parking

Folding

Unfolding

DiscSystem

Coulter

TurboDisc coulter

Adjusting the coulter discs for preload and checking for wear.

Press rollers

Drilling depth setting

Coulter pressure

Metering unit

Rotors

Information on available rotors for different seeds and fertilisers.

Rotor change

Coarse seeds

Metering unit with injector fall sluice

Maintenance of metering unit

Optional equipment

Front packer

Function and maintenance of front and intermediate axle packers.

Heavy duty harrow

Pre-emergence markers

Track loosener

Track loosening tines

Securing track loosening tines against overload.

Filling auger

Hydraulic coulter pressure adjustment

Micro-granulate facility

Seed calibration

Maize distributor

DuoDrill

Pneumatic system

Optional equipment

Brake system

Information on pneumatic or hydraulic brake systems and parking brake.

Hydraulic brake

Parking brake

Wheels and tyres

Changing wheels (undercarriage)

Care and Maintenance

Cleaning

Procedures for cleaning machine components, avoiding high-pressure water.

Maintenance intervals

Troubleshooting

Maintenance overview

Pressure accumulator

Maintenance for pressure accumulators and electrical lines.

Fertiliser metering unit

Maintenance for roller, sealing lip, rotor, and distributor tower.

Coulter discs

Checking state, wear, bearing play, and movement of coulter discs.

Wheels / brakes

Checks for undercarriage, wheels, and brake system.

At the end of the season

End-of-season care and cleaning procedures.

Lubrication points

Waste disposal

Appendix

Selecting the metering auger

Guide to selecting metering augers based on size, granulate, and quantity.

Seed / granulate quantities - working width 3 m

Seed / granulate quantities - working width 4 m

Seed / granulate quantities - working width 6 m

Related product manuals