Step:
Standard Operation Procedure
Document No. Autobot FA DIS ASS’Y SOP Station :
Name : Ver. : Date :
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard)
Qty
Holding fixture list (holding fixture standard)
Qty
Tabulator:
Issue department:
Tzan.uen-tung
NPSU-PPE
Auditor :
Tzan.uen-tung
1. Loosen FP BRKT screw *1, Disassemble FP BRKT(Fig.1)。
2. Disassemble FP module,& FP FPC,Fig.2
9(1/1)
Electric torx screw driver(#1) 1
Disassemble FP
Fig.
1
取螺絲*1
指紋鐵件
Fig.
2
2017/7/22
1.00