Step:
Standard Operation Procedure
Document No. Autobot FA DIS ASS’Y SOP Station :
Name : Ver. : Date :
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard)
Qty
Holding fixture list (holding fixture standard)
Qty
Tabulator:
Issue department:
Tzan.uen-tung
NPSU-PPE
Auditor :
Tzan.uen-tung
Loosen BTCB screw s
1. Loosen BTCB screw s*5
2. Use Sucker Disassemble BTCB
1(1/1)
Electric torx screw driver(T5) 1
Sucker 1
Fig.2
3
4
2
1
1
Fig.1
2017/7/22
1.00