Standard Operation Procedure
Document No. Oldman FA DIS ASS’Y SOP Station :
Name : Ver. : Date :
Step:
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard)
Qty
Holding fixture list (holding fixture standard)
Qty
Tabulator:
Issue department:
Tzan.Uen-tung
NPSU-PPE
Auditor :
Tzan.Uen-tung
Disassemble WLAN&camera cable
1. Disassemble WLAN Antenna (Fig1)
2. Disassemble hinge Screws
3. Disassemble IR cable(Fig2/3)
4. Disassemble camera cable CNTR,Fig4
6(1/1)
Fig4
Fig1
Fig3
Fig2
2016/12/05
1.00
Electric cross screwdriver #1 1