Hardware options installation 40
11. Install the access panel. ("Installing the access panel" on page 21)
12. Install the front bezel ("Installing the front bezel" on page 20).
13. Power on the server ("Power up the server" on page 19, "Powering up and configuring the server" on
page 29).
Hot-plug SFF hard drive cage option
1. Power down the server (on page 19).
2. Remove the front bezel ("Removing the front bezel" on page 19).
3. Remove the access panel ("Removing the access panel" on page 20).
4. Remove any hard drives installed ("Removing a hard drive" on page 35).
5. Disconnect all cables from the drive cage.