Standard Operation Procedure
Document No. : Grizzly disassembly SOP Station:
Operation Name : Ver. : Edit date:
Fixture list (Spec.) Qty
Step:
Notice: Please inform production line leader or master if you found any abnormal..
Issued:Prepared: Zhou.gui-ling
IE department
Safe
Order
Hear
Look
Do
Static
Qual
ity
Fixtur
e
Symbol
Disassembly DDR
6(1/1)
1. Disassembly DDR from unit as Pic.1.
2. Take away mylar that stick on WWAN card connector as Pic.2.
Disassembly
DDR
Take away
mylar
Pic.1
Pic.2
1.00
2020/09/15