Standard Operation Procedure
Document No. : Grizzly disassembly SOP Station:
Operation Name : Ver. : Edit date:
Fixture list (Spec.) Qty
Step:
Notice: Please inform production line leader or master if you found any abnormal..
Issued:Prepared: Zhou.gui-ling
IE department
Safe
Order
Hear
Look
Do
Static
Qual
ity
Fixtur
e
Symbol
Disassembly antenna & EDP cable
8(1/1)
1. Disassembly antenna from WWAN Module pin,
and take out antenna from hook as Pic.1 & Pic.2
2. Disassembly EPD cable from connector and
take out from cable trough as Pic.3 & Pic.4.
1.00
Disassembly antenna
Pin from WWAN Module
Take out antenna from hook
Disassembly
EDP cable
Take out
EDP cable
Pic.4
Pic.3
Pic.2
Pic.1
2020/09/15