Standard Operation Procedure
Document No. Cyclone 15B FA DIS ASS’Y SOP Station :
Name : Ver. : Date :
Step:
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard)
Qty
Holding fixture list (holding fixture standard)
Qty
Tabulator:
Issue department:
Alicia Chien
NPSU-PPE
Auditor :
Stanley Chen
disassembly Battery
1(1/1)
Fig.1
0.1
2013/08/23
1. Turn the computer over. (Fig.1)
2. Slide the battery latch to the unlock position.
(Fig.1)
3. Remove the battery.
Battery
Battery Latch