Standard Operation Procedure
Document No. Cyclone 15B FA DIS ASS’Y SOP Station :
Name : Ver. : Date :
Step:
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard)
Qty
Holding fixture list (holding fixture standard)
Qty
Tabulator:
Issue department:
Alicia Chien
NPSU-PPE
Auditor :
Stanley Chen
[ Ignore below procedures for the SKU
without WWAN ]
1. disassembly WWAN cables from WWAN
module. (Fig.1)
2. Loosen M2x2 screw (6052B0156301) * 1.
(Fig.1)
3. disassembly WWAN card. (Fig.2)
disassembly WWAN Card
Fig.2
Fig.1
5(1/1)
0.1
2013/08/23
Electric cross screwdriver #1 1