Standard Operation Procedure
Document No. Cyclone 15B LCM DIS ASS’Y SOP Station :
Name : Ver. : Date :
Step:
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard)
Qty
Holding fixture list (holding fixture standard)
Qty
Tabulator:
Issue department:
Alicia Chien
NPSU-PPE
Auditor :
Stanley Chen
Fig.1
disassembly Hinge Cap
1(1/1)
2013/08/27
0.1
1. Put the LCM on support fixture.
2. Loosen screw (6052B0031301) * 1, take out
the hinge cap - R (6051B0812901).(Fig.1 )
and recycle it .
3. Loosen screw (6052B0031301) * 1, take out
the hinge cap - L (6051B0812801). (Fig.2 )
and recycle it .
Fig.2
Electric cross screwdriver (#0) 1
Hinge CAP support fixture 1
LCM support fixture 1