Standard Operation Procedure
Document No. Cyclone 15B LCM DIS ASS’Y SOP Station :
Name : Ver. : Date :
Step:
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard)
Qty
Holding fixture list (holding fixture standard)
Qty
Tabulator:
Issue department:
Alicia Chien
NPSU-PPE
Auditor :
Stanley Chen
Fig.1
disassembly Bezel
1. disassembly bezel in order. (Fig.1)
2. Recycle bezel.
For MIC/B Model: plug (Fig.2)
For Camera/B Model: lens (Fig.3)
2(1/1)
2013/08/27
0.1
3
1
2
2
Transparent
lens
Black plug
MIC/B Model Camera/B Model
Fig.2
Fig.3