Standard Operation Procedure
Document No. Cyclone 15B FA DIS ASS’Y SOP Station :
Name : Ver. : Date :
Step:
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard)
Qty
Holding fixture list (holding fixture standard)
Qty
Tabulator:
Issue department:
Alicia Chien
NPSU-PPE
Auditor :
Stanley Chen
disassembly ODD/B
1. Loosen screw - M2x2 (6052B0156301) * 1.
(Fig.3)
2. disassembly ODD/B from BTCB. (Fig.2/Fig.3)
Fig.2
Fig.1
Electric cross screwdriver #1 1
0.1
2013/08/23
21(1/1)
Fig.3